6kw controller shell
Product introduction: Focus on 15 years of experience in high-end surface treatment die-casting parts, strictly follow the ISO9001 system process, and have more than 90% of the industry's experience in die-casting surface treatment technology. Fast delivery only takes 3-7 days.
Product parameters (specifications): Professional to map customization.
Product features and applications: Auto parts die casting. Widely used in the automotive industry. High precision, oxidation resistance, corrosion resistance.

Product details: 2019 IATF16949: 2016 International Quality System Certification
2015 Obtained ISO9001:2015 quality system certification
Shipping: Support sea, land or air.

Service: Provide one-stop service for mold design and manufacture, production, follow-up processing (drilling and tapping, CNC machining, grinding and polishing, sandblasting, shot peening, powder spraying, passivation and other surface treatments).
FAQ:
1.Q: How long does it take to develop a new project?
A: It only takes about 40 days.
2.Q: Need to shorten the development cycle
A: Shorten the time for making blanks, achieve seamless links, and do not waste time.
3.Q: Demand production batch is small and urgent
A: Small batch production is possible, but part of the cost will be charged.
4.Q: Can I pay less first?
A: At least not less than 30% advance payment.