Pump casing

pump casing

 

Pump casing

Product introduction: The mold opening time is 7-10 days, and the batch can be shipped within 5 days after the sample is confirmed. The 24-hour response to abnormal quality is handled by the safety and quality specialist.

Product parameters (specifications): Professional drawings or samples customized.

Product features and applications: Auto parts die casting. Widely used in the automotive industry. High precision, oxidation resistance, corrosion resistance.

Pump casing

Product details: Using the latest die-casting technology to provide high-quality, on-demand components.

Shipping: Support sea, land or air.

Shipping

Service: Provide one-stop service for mold design and manufacture, production, follow-up processing (drilling and tapping, CNC machining, grinding and polishing, sandblasting, shot peening, powder spraying, passivation and other surface treatments).

FAQ:

1.Q: How long does it take to develop a new project?

A: It only takes about 40 days.

2.Q: Need to shorten the development cycle

A: Shorten the time for making blanks, achieve seamless links, and do not waste time.

3.Q: Demand production batch is small and urgent

A: Small batch production is possible, but part of the cost will be charged.

4.Q: Can I pay less first?

A: At least not less than 30% advance payment.

Product Tag

Send Inquiry